BE-DE II

The BE-DE II project is a second interconnection between Belgium and Germany

Second interconnection between Belgium and Germany

New interconnectors are required in order to strengthen the European electricity market, facilitate the energy transition and overcome the challenge associated with it.  For these aims to be achieved, the North-South axis must be reinforced and East-West, interconnections must be built.  Europe’s need for these projects is clear.
After ALEGrO, the BE-DE II project will be the second interconnection between Belgium and Germany, and has already been labeled as a PCI project. As with the first interconnection, it will be the result of a partnership between Elia and Amprion.  Further study is required to determine the new interconnector’s location, route and capacity, and set a timetable for its construction.  Elia and Amprion are conducting a bilateral feasibility study to this end.  More information will be provided in future development plans.
  • texte In the interest of society

    This second interconnector aims at delivering three main objectives:

    • Contribute to further price convergence.
    • Enhance the integration of renewables at European level.
    • Help managing increasingly volatile energy flows within the European energy system


Contact us

If you are affected by a project and want to ask us something, please feel free to contact us.
Our team would be happy to help.

This website uses cookies to provide you with an optimal browsing experience. Some cookies are strictly necessary for the operation of this website and cannot be rejected, while others are used for analytical/functional/targeting purposes and can be rejected. For more information, please consult our Cookie Policy . You can manage/change your cookie preferences at any time. If you do not manage your preferences, only the cookies which are strictly necessary will be accepted.