23 April 2019
Public consultation for the submission of a proposed general derogation from Regulation (EU) 2016/631 establishing a network code on requirements for grid connection of generators ("RfG")
In line with what was announced during the consultation on the maximum capacity thresholds for type B, C and D power-generating modules (PGMs), Elia wishes to announce the public consultation of a request for a derogation from the requirements applicable to PGMs with a maximum installed capacity of 25 MW and a connection point voltage greater than or equal to 110 kV.
Elia wishes to receive technical and financial arguments from producers to flesh out the cost-benefit analysis in favour of such a derogation.
The consultation period will extend from 23 April 2019 to 22 May 2019.